    we have successfully completed more than 30 projects till date and also bagged with handful new client projects.

  • Verticals

    1. Hospitals: Indo American, Indo US, Fernandez Hospital, Merit care, Basavatarakam, Nano hospital
    2. Pharma: Unicorn, Biomax life sciences, Shilpa Medicare, Neuland laboratories, Satyavathi bio life sciences
    3. Hotels: Daspalla hotels, Marriott, Kapadia hotels.
    4. Process Industries: Avalon cosmetics, Pioneer seeds, Kayempee foods, Vimta labs, AMRI Global, Zuari cements
    5. Education: ICFAI University, IBS
    6. Warehouse/storage space: Bosch, A-star logistics, Snowman logistics ltd.
    7. Commercial spaces: More supermarkets.
    8. Electrical projects: BHEL, AP-TRANSCO.
    9. Urban infrastructure: L&T- Hyderabad Metro Rail
  • Clients Speak


    Mr.N.Prasad has been associated with us erstwhile, we have named him as fire Prasad, and he is very enterprising and versatile personality who likes to work against laid down deadlines. He has a dedicated and intelligent team; he always led them from front. We like to wish him all the very best for all his future endeavors and new assignments.

    Col. A.K. Sabharwal, M.P.M, D.B.M. (Administrator), Fernandez Hospital.

    We have approached basic elements solutions for replacement of our existing pump house with new one. We were racing against time as we had a yearend rush. Basic elements solutions delivered the project assigned on time; though it had many challenges and was executed in well ordered manner. We wish Mr. Prasad and his team all the very best for all their future endeavors.

    Padmacharan, Director of Engineering, Marriott Hotels.

    Consistent with commitment

    Rakesh, A-star Logistics.

  • Case Studies


    1. Marriott Hotels:

    Case: Marriott hotels had a challenge of re equipping their pump house which was built 20years old with concurrent concepts that were prevailing at that time. Challenge was to replace whole pumps within 48 hours while keeping whole system live on standby.

    Solution: We have designed and executed the complete pump house by the following method:

    1. We have pre assembled the suction and delivery lines based on new dimensions of pumps.
    2. Dismantled the old pumps and panel.
    3. Installed the new pumps and panel working continuously for 48 hours to meet deadline.

    Benefit to client: Being a five star hotel they could successfully transform their whole pump house to much higher capacity without any eventuality or interruption to their regular activities.

    2. Fernandez Hospital:

    Case: When inspected Fernandez hospital, they had no space to build pump house; However, they wanted a pump house with positive suction and also must comply with law of land. Challenge was to complete such a huge task with no space anywhere.

    Solution: After an in-depth analysis and examination, Basic elements solutions could carve a niche and build a pump house in utility sump and make it thoroughly functional with adequate ventilation and easy approachability.

    Benefit to client: Fernandez hospital had a cost saving benefit as they were considering vertical turbine pumps which was four times the cost, also when they have applied for NOC they could get it easily as it was gratifying NBC norms.

    3. Avalon cosmetics Pvt. Ltd:

    Case: When surveyed and submitted our drawing, the shed plan and anchoring were not specific and workable to install fire fighting system and this was a challenge to us in execution.

    Solution: We could re design according to their site conditions and also made it in compliance with law of land.

    Benefit to client: We were successful in meeting our service deadline, which resulted in resuming their production activity on time.

  • Awards and Recognition


    Awarded as Best Vendor in fire safety at Basavatarakam Indo American Cancer Hospital and Research Institute by Honorable Chief Minister of Andhra Pradesh, Mr. Chandra Babu Naidu Garu.